The Idea:
To recreate Canada's Parliament Hill on a large claim in North-West Downtown. I want to create the four main buildings, as well as the green space.
The Plan: (ETA 18 Months)
Part 1: (ETA 6 Months)
- Level the top central block which the central building, peace tower, and library will sit upon
- Determine ground level vs cloud level (peace tower is highest point - library peak is second)
- Map out buildings to scale on the ground
- Construct buildings
Part 2: (ETA 4 Months)
- Level the east block land
- Map out building to scale
- Construct building
Part 3: (ETA 4 Months)
- Level the west block land
- Map out building to scale
- Construct building
Part 4: (ETA 2 Months)
- Level the green space
- Place out walkways to scale
- Beg and Plea to have fire placed for the "Eternal Flame"
Part 5: (ETA 2 Months)
- Level the ground surrounding the buildings and rest of claim
- Expand waterways to replicate Ottawa
- Finish surrounding walkways
Part 6: (ETA TBD)
- Examine possibility of constructing a highway along the North and West borders of Downtown
- Plan and build additional project
To recreate Canada's Parliament Hill on a large claim in North-West Downtown. I want to create the four main buildings, as well as the green space.
The Plan: (ETA 18 Months)
Part 1: (ETA 6 Months)
- Level the top central block which the central building, peace tower, and library will sit upon
- Determine ground level vs cloud level (peace tower is highest point - library peak is second)
- Map out buildings to scale on the ground
- Construct buildings
Part 2: (ETA 4 Months)
- Level the east block land
- Map out building to scale
- Construct building
Part 3: (ETA 4 Months)
- Level the west block land
- Map out building to scale
- Construct building
Part 4: (ETA 2 Months)
- Level the green space
- Place out walkways to scale
- Beg and Plea to have fire placed for the "Eternal Flame"
Part 5: (ETA 2 Months)
- Level the ground surrounding the buildings and rest of claim
- Expand waterways to replicate Ottawa
- Finish surrounding walkways
Part 6: (ETA TBD)
- Examine possibility of constructing a highway along the North and West borders of Downtown
- Plan and build additional project