Garquille
Well-known member
- Joined
- Dec 24, 2010
- Messages
- 48
- Thread Author
- #1
It all needs to be flattened to 2-below sea level for now (red line indicates -2 indent path). I've destroyed 130000 blocks (I'm guessing 115k of which was the land in this spot) over the last week and a half or so and I'm like 60% done the first step.
Frankly I'd like to at least start building my project before it's back to college. If we can work some sort of cap payment out for clearing stone/dirt that could be cool.